Wind farms
Vennebjerg (Denmark)| Vennebjerg (Denmark) |
|
| Operational (0,75 MW) - Dismantled (0,15 MW) |

| Country | Denmark |
| County/Zone | Hjorring (Nordjylland) |
| City | Vennebjerg |
| Wind farm type | Onshore wind farm |

![]() | 0.15 MW commissioned |
![]() | 0.3 MW commissioned |
![]() | 0.3 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 0.15 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Bonus B23/150 (x 5) |
| Dismantled | Wind World W2320/150 (x 1) |

![]() | |

| City | Vennebjerg |
| Commissioning | ![]() |
| Turbines | 2x Bonus B23/150 (power 150 kW, diameter 23 m) |
| Hub height | ![]() |
| Total nominal power | 300 kW |
| Status | Operational |
| Coordinates | Latitude 57° 27' 5.3" - Longitude 9° 50' 57" |
| Precise localization | No |
| City | Vennebjerg |
| Commissioning | ![]() |
| Turbines | 2x Bonus B23/150 (power 150 kW, diameter 23 m) |
| Hub height | ![]() |
| Total nominal power | 300 kW |
| Status | Operational |
| Coordinates | Latitude 57° 27' 5.3" - Longitude 9° 50' 57" |
| Precise localization | No |
| City | Vennebjerg |
| Commissioning | ![]() |
| Turbine | 1x Bonus B23/150 (power 150 kW, diameter 23 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Operational |
| Coordinates | Latitude 57° 27' 5.3" - Longitude 9° 50' 57" |
| Precise localization | No |
| City | Vennebjerg |
| Commissioning | ![]() |
| Turbine | 1x Wind World W2320/150 (power 150 kW, diameter 23.2 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2002/11) |
| Coordinates | Latitude 57° 27' 5.3" - Longitude 9° 50' 57" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hundelev (3 km) Hundelev-Jelstrup (3 km) Harritslev (4 km) Skallerup (5 km) Jonstrup (5 km) Borglumkloster (6 km) Garestrup-Sct Olai (7 km) Vidstrup (7 km) Hjorring Jorder (8 km) Vejby (Hjorring) (8 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Hjorring (Nordjylland) : 138.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||