Wind farms
El Peralejo (Spain)| El Peralejo (Spain) |
|
| Operational (26 MW) |

| Country | Spain |
| County/Zone | Cuenca (Castilla-La Mancha) |
| City | Tinajas - Villalba del Rey |
| Wind farm type | Onshore wind farm |

![]() | 20 MW commissioned |
![]() | 6 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G90/2000 (x 13) |

| No source available |

| City | Villalba del Rey, Tinajas |
| Commissioning | ![]() |
| Turbines | 10x Gamesa G90/2000 (power 2,000 kW, diameter 90 m) |
| Total nominal power | 20,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 21' 5" - Longitude -2° 36' 34.6" |
| Precise localization | Yes |
| Part | Ampliacion |
| City | Villalba del Rey, Tinajas |
| Commissioning | ![]() |
| Turbines | 3x Gamesa G90/2000 (power 2,000 kW, diameter 90 m) |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 21' 5" - Longitude -2° 36' 34.6" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms El Escepar (3 km) El Escepar Ampliación (3 km) Gascuena Este (12 km) Carrascosa (40 km) Cuevas de Velasco (41 km) Canredondo I (51 km) Villamayor (68 km) La Plata Ampliación (74 km) La Plata (74 km) El Chaparro (74 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Cuenca (Castilla-La Mancha) : 1,667.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||