Wind farms
El Olivillo (Spain)| El Olivillo (Spain) |
|
| Operational (25,5 MW) |

| Coordinates | Latitude 36° 41' 11.6" - Longitude -6° 8' 13.8" |
| Precise localization | No |
Reserved for Premium Access
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Roalabota (0 km) Chorreaderos Altos (1 km) Chorreaderos Bajos (1 km) Bolaños (1 km) La Rabia (8 km) El Barroso (9 km) El Marquesado (12 km) Alijar II (13 km) Alijar (14 km) Doña Benita Cuellar (17 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Cadiz (Andalucía) : 1,539.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||