Wind farms
Vieiro (Spain)| Vieiro (Spain) |
|
| Operational (19,6 MW) |

| Coordinates | Latitude 42° 5' 41.4" - Longitude -7° 59' 21.2" |
| Precise localization | Yes |
| Google Maps | Link |
| BingMaps | Link |
| OpenSteetMap | Link |
| Coordinates | Latitude 42° 5' 31" - Longitude -7° 59' 30.1" |
| Precise localization | Yes |
| Google Maps | Link |
| BingMaps | Link |
| OpenSteetMap | Link |
| Coordinates | Latitude 42° 5' 31" - Longitude -7° 59' 30.1" |
| Precise localization | Yes |
| Google Maps | Link |
| BingMaps | Link |
| OpenSteetMap | Link |
Reserved for Premium Access
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Alto Minho (18 km) Serra do Larouco (24 km) Cabeço Alto (27 km) Arbo (29 km) Deva (30 km) Montouto 2000 (31 km) Fonteavia II (34 km) Fonteavia I (34 km) As Neves (35 km) Terra Fria (36 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Ourense (Galicia) : 320.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 20 January 2025 |
||