Wind farms
Sierra de Bodenaya (Spain)| Sierra de Bodenaya (Spain) |
|
| Operational (18 MW) |

| Coordinates | Latitude 43° 24' 12.5" - Longitude -6° 18' 7.4" |
| Precise localization | Yes |
| Google Maps | Link |
| BingMaps | Link |
| OpenSteetMap | Link |
Reserved for Premium Access
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Curiscao Fase II (8 km) Curiscao Fase I (8 km) Pico Gallo (8 km) Sierra de Tineo (11 km) Belmonte (11 km) Baos y Pumar Fase II (11 km) Baos y Pumar Fase I (11 km) Verdigueiro (19 km) Capiechamartin (25 km) Peña del Cuervo (25 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Asturias : 698.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 January 2025 |
||