Part #1:
- City: Arganil
- Commissioning:

- 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: Enersis
- Operator: Enel GreenPower
- Owner:

- Source:

Production forecast
- From Tuesday, December 5 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 5.3 %
- Expected production: 2,530 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Arganil
- Commissioning:

- 13 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Total nominal power: 26,000 kW
- Operational
- Onshore wind farm
- Developer: Enersis
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Tuesday, December 5 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 4.4 %
- Expected production: 27,450 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Arganil
- Commissioning:

- 4 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developer: Enersis
- Operator: Enel GreenPower
- Owner:

- Source:

Production forecast
- From Tuesday, December 5 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 1.8 %
- Expected production: 3,440 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 40° 12' 3"
- Longitude: -7° 47' 45.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 40° 12' 3"
- Longitude: -7° 47' 45.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 40° 12' 3"
- Longitude: -7° 47' 45.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: