Wind farms
Sobrado (Portugal)| Sobrado (Portugal) |
|
| Operational (8,2 MW) |

| Country | Portugal |
| County/Zone | Viseu (Centro/Norte) |
| City | Castro Daire |
| Wind farm type | Onshore wind farm |

![]() | 8.2 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Senvion MM82/2050 (x 4) |

![]() | |
![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 40° 57' 58.4" - Longitude -8° 2' 19.6" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Lameira (1 km) Arada-Montemuro (1 km) Cabril (1 km) Alto do Côto (5 km) Sao Pedro (5 km) Bustelo (PT) (5 km) Casais (6 km) Fonte da Quelha (7 km) Cinfaes (8 km) Tendais (10 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Viseu (Centro/Norte) : 1,161.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 9 March 2026 |
||