[Back to previous page]
Generalities
|
|
Details
- City: Fressenville
- Commissioning:

- 2 turbines: Enercon E103/2350 (power 2 350 kW, diameter 103 m)
- Total nominal power: 4,700 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operator: Energieteam
- Owner:

Production forecast
- From Monday, September 25 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 15.1 %
- Expected production: 17,090 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 50° 4' 49.2"
- Longitude: 1° 34' 2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 16 August 2022
Complete/correct this sheet: