[Back to previous page]
Generalities
|
|
Details
Part #1:
- Commissioning: 2011/07
- 29 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 58,000 kW
- Operational
- Onshore wind farm
- Developers: Vattenfall/OX2
- Operator: Vattenfall
- Owner: Vattenfall
- Source: http://powerplants.vattenfall.com/#/types=Wind/view=list/sort=name
- Source: http://www.ox2.com/en/projekt/stor-rotliden/
Part #2:
- Commissioning: 2011/07
- 11 turbines: Vestas V90/1800 (power 1 800 kW, diameter 90 m)
- Total nominal power: 19,800 kW
- Operational
- Onshore wind farm
- Developers: Vattenfall/OX2
- Operator: Vattenfall
- Owner: Vattenfall
- Source: http://powerplants.vattenfall.com/#/types=Wind/view=list/sort=name
- Source: http://www.ox2.com/en/projekt/stor-rotliden/
Localisation
Part #1:
- Latitude: 64° 13' 21.2"
- Longitude: 18° 21' 29.2"
- Altitude: 530 m
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 64° 13' 21.2"
- Longitude: 18° 21' 29.2"
- Altitude: 530 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 15 March 2018
Complete/correct this sheet: