Wind farms
Caparroso (Spain)| Caparroso (Spain) |
|
| Operational (33,92 MW) |

| Country | Spain |
| County/Zone | Navarra |
| City | Caparroso - Caparroso |
| Wind farm type | Onshore wind farm |

![]() | 1.67 MW commissioned |
![]() | 32.25 MW commissioned |

| Developers |
![]() ![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Ecotecnia 48 (x 43) |
| Operational | Ecotecnia 80 1.6 (x 1) |

![]() | |

| City | Caparroso |
| Commissioning | ![]() |
| Turbines | 43x Ecotecnia 48 (power 750 kW, diameter 48 m) |
| Total nominal power | 32,250 kW |
| Status | Operational |
| Developers | /![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 18' 9" - Longitude -1° 38' 2.2" |
| Altitude | 400 m |
| Precise localization | Yes |
| City | Caparroso |
| Commissioning | ![]() |
| Turbine | 1x Ecotecnia 80 1.6 (power 1,670 kW, diameter 80 m) |
| Total nominal power | 1,670 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 17' 45.2" - Longitude -1° 37' 11.5" |
| Altitude | 400 m |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Cavar 1 (6 km) Cavar 2 (7 km) Cavar 3B (8 km) Cavar 3A (8 km) La Fraila (17 km) Caluengo (18 km) Transporte (18 km) La Caya (18 km) Moncayuelo (19 km) Corral del Molino (20 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Navarra : 1,627.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||