[Back to previous page]
Details
- City: Pedrosa del Río Urbel
- Commissioning:

- 33 turbines: GE Energy 1.5sle (power 1 500 kW, diameter 77 m)
- Total nominal power: 49,500 kW
- Operational
- Onshore wind farm
- Developers: PE La Boga SL/Cobra
- Operator: ACS
- Owner:

- Source:

Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 46.2 %
- Expected production: 548,950 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 42° 25' 35.8"
- Longitude: -3° 50' 36.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 14 January 2022
Complete/correct this sheet: