Details
- City: Huérmeces, Villadiego
- Commissioning:

- 15 turbines: GE Energy 1.5sle (power 1 500 kW, diameter 77 m)
- Total nominal power: 22,500 kW
- Operational
- Onshore wind farm
- Developer: ACS
- Owner:

Production forecast
- From Sunday, May 22 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 39.6 %
- Expected production: 213,710 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 42° 31' 18"
- Longitude: -3° 46' 21.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 14 January 2022