[Back to previous page]
Generalities
|
|
Details
- City: Pedraza de Campos, Torremormojón
- Commissioning:

- 16 turbines: Ecotecnia 80 1.6 (power 1 670 kW, diameter 80 m)
- Hub height:

- Total nominal power: 26,720 kW
- Operational
- Onshore wind farm
- Developer: Elecdey
- Operator: Elecdey
Localisation
Update for this sheet: 21 April 2025