Generalities
|
|
Details
- City: Pozo Llorente
- Commissioning:

- 25 turbines: GE Energy 1.5sle (power 1 500 kW, diameter 77 m)
- Total nominal power: 37,500 kW
- Operational
- Onshore wind farm
- Developers: ACS/Cobra
- Operator: ACS
Production forecast
- From Friday, February 3 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 12.3 %
- Expected production: 111,040 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 39° 3' 11.2"
- Longitude: -1° 30' 5.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 10 August 2022
Complete/correct this sheet: