Generalities
|
|
Details
Part #1:
- Part: Grebban 1-2
- City: Tanumshede
- Commissioning:

- 2 turbines: Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Operator: Gislov Vind AB
Production forecast
- From Wednesday, May 31 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 23.1 %
- Expected production: 6,660 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Grebban 3 - Tanumshede
- City: Tanumshede
- Commissioning:

- 1 turbine: Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height:

- Total nominal power: 850 kW
- Operational
- Onshore wind farm
Production forecast
- From Wednesday, May 31 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 34.2 %
- Expected production: 6,990 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Grebban 1-2
- Latitude: 58° 52' 11.9"
- Longitude: 11° 17' 23.9"
- Altitude: 65 m
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Grebban 3 - Tanumshede
- Latitude: 58° 43' 11.9"
- Longitude: 11° 19' 48"
- Altitude: 65 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 25 February 2023