[Back to previous page]
Details
- City: Hannover
- Commissioning:

- 5 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 2,500 kW
- Operational
- Onshore wind farm
- Developer: Windwärts
- Operator: Windwärts
- Source:

Production forecast
- From Tuesday, August 09 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.7 %
- Expected production: 2,830 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 52° 18' 36.8"
- Longitude: 9° 47' 50.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 18 May 2017
Complete/correct this sheet: