[Back to previous page]
Generalities
- Wind farm name: Vertical Wind
- Country: Sweden
- County / Zone: Halland
|
|
Details
- City: Falkenberg
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Hub height:

- Total nominal power: 200 kW
- Operational
- Onshore wind farm
- Developer: E.ON Climate Renewables
Production forecast
- From Friday, January 22 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 78.7 %
- Expected production: 3,780 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 56° 54' 4.8"
- Longitude: 12° 29' 3.4"
- Altitude: 20 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 16 December 2020
Complete/correct this sheet: