- Commissioning:

- 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Developer: Energie 2030
- Operator: Energie 2030
- Owner:

- Source:

Production forecast
- From Wednesday, February 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 30.6 %
- Expected production: 3,670 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Sankt-Vith
- Commissioning:

- 5 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developer: BMR
- Operator: Encevo
- Owner:

- Source:

Production forecast
- From Wednesday, February 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 27.7 %
- Expected production: 66,440 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Sankt-Vith
- Latitude: 50° 17' 28.4"
- Longitude: 6° 5' 9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Sankt-Vith
- Latitude: 50° 18' 16.7"
- Longitude: 6° 4' 20.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures

Author: Patrick Kelleter - Source: Energie2030 - License: All right reserved
Picture reference: 263 
Author: Patrick Kelleter - Source: Energie2030 - License: All right reserved
Picture reference: 264 
Author: Patrick Kelleter - Source: Energie2030 - License: All right reserved
Picture reference: 265 
Author: Patrick Kelleter - Source: Energie2030 - License: All right reserved
Picture reference: 266 
Author: Patrick Kelleter - Source: Energie2030 - License: All right reserved
Picture reference: 267 
Author: Patrick Kelleter - Source: Energie2030 - License: All right reserved
Picture reference: 268
Update for this sheet: 20 October 2022
Complete/correct this sheet: