[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Basedow
- Commissioning:

- 7 turbines: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
- Hub height:

- Total nominal power: 9,100 kW
- Operational
- Onshore wind farm
- Owner:

Production forecast
- From Tuesday, March 09 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 0.7 %
- Expected production: 1,510 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Basedow
- Commissioning:

- 4 turbines: Vestas
- Total nominal power: 2,200 kW
- Operational
- Onshore wind farm
Production forecast
- From Tuesday, March 09 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 1.2 %
- Expected production: 610 kWh
- Values from Weathernews Windcaster solution
Part #3:
Production forecast
- From Tuesday, March 09 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 2.6 %
- Expected production: 1,460 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 41' 37.9"
- Longitude: 12° 39' 56.8"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 41' 37.9"
- Longitude: 12° 39' 56.8"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 41' 37.9"
- Longitude: 12° 39' 56.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 14 October 2020
Complete/correct this sheet: