Generalities
|
|
Details
Part #1:
- Commissioning: 2003/11
- 72 turbines: Bonus B82/2300 (power 2 300 kW, diameter 82.4 m)
- Hub height: 69 m
- Total nominal power: 165,600 kW
- Operational
- Offshore wind farm
- Developer: Orsted
- Operator: Orsted
- Owners: Orsted/Stadtwerke Lübeck GmbH/PensionDanmark
- Source: https://orsted.com/en/Our-business/Wind-Power/Our-wind-farms
- Source: https://ens.dk/en/our-services/statistics-data-key-figures-and-energy-maps/overview-energy-sector
Production forecast
- From Saturday, February 23 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 28.3 %
- Expected production: 1,123,680 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Nysted
- Commissioning: 2000/07
- 6 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height: 45 m
- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
- Source: https://ens.dk/en/our-services/statistics-data-key-figures-and-energy-maps/overview-energy-sector
Production forecast
- From Saturday, February 23 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 24.1 %
- Expected production: 25,980 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 54° 32' 56.3"
- Longitude: 11° 42' 50.4"
- Depth: -8 m
- Distance from shore: 11 km
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 54° 40' 51.8"
- Longitude: 11° 46' 56.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures

Author: Nicole Pezet - License: All right reserved
Picture reference: 8829 - Date: 2009

Author: Nicole Pezet - License: All right reserved
Picture reference: 8830 - Date: 2009

Author: Nicole Pezet - License: All right reserved
Picture reference: 8831 - Date: 2009

Author: Nicole Pezet - License: All right reserved
Picture reference: 8832 - Date: 2009
Update for this sheet: 20 November 2018
Complete/correct this sheet: