Online access > Wind farms > Bückwitz (Germany)


[Back to previous page]

Germany wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Bückwitz
  • Commissioning: 2014
  • 5 turbines: Enercon E53/800 (power 800 kW, diameter 52.9 m)
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Windenergie Wenger-Rosenau GmbH
  • Operator: Windenergie Neuruppin GmbH
  • Owner: Eurowind
  • Source: http://wenger-rosenau.de/referenzen/
  • Source: http://ewe.dk/DK/Referencer.aspx
  • Source: http://www.windenergie-neuruppin.de/Von_der_Windenergie_Neuruppin_betreute_Windparks_.5.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 15.4 %
  • Expected production: 2,780 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • City: Bückwitz
  • Commissioning: 2003
  • 6 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
  • Hub height: 74 m
  • Total nominal power: 5,100 kW
  • Operational
  • Onshore wind farm
  • Developer: Global Wind Power
  • Operator: Global Wind Power
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 38.3 %
  • Expected production: 46,840 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • City: Bückwitz
  • Commissioning: 2002
  • 15 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
  • Hub height: 74 m
  • Total nominal power: 12,750 kW
  • Operational
  • Onshore wind farm
  • Developer: Windenergie Wenger-Rosenau GmbH
  • Operator: Windenergie Neuruppin GmbH
  • Source: http://wenger-rosenau.de/referenzen/
  • Source: http://www.windenergie-neuruppin.de/Von_der_Windenergie_Neuruppin_betreute_Windparks_.5.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 37.2 %
  • Expected production: 113,910 kWh
  • Values from Weathernews Windcaster solution

Part #4:

  • City: Bückwitz
  • Commissioning: 2013
  • 3 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Total nominal power: 6,900 kW
  • Operational
  • Onshore wind farm
  • Developer: Windenergie Wenger-Rosenau GmbH
  • Operator: Windenergie Neuruppin GmbH
  • Owner: Eurowind
  • Source: http://wenger-rosenau.de/referenzen/
  • Source: http://ewe.dk/DK/Referencer.aspx
  • Source: http://www.windenergie-neuruppin.de/Von_der_Windenergie_Neuruppin_betreute_Windparks_.5.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 11 %
  • Expected production: 92,700 kWh
  • Values from Weathernews Windcaster solution

Part #5:

  • City: Bückwitz
  • Commissioning: 2002
  • 2 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
  • Total nominal power: 1,700 kW
  • Operational
  • Onshore wind farm
  • Developer: Zopf GmbH
  • Operator: Zopf GmbH
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 37.2 %
  • Expected production: 15,190 kWh
  • Values from Weathernews Windcaster solution

Part #6:

  • City: Bückwitz
  • Commissioning: 2001
  • 2 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
  • Hub height: 74 m
  • Total nominal power: 1,700 kW
  • Operational
  • Onshore wind farm
  • Developer: Global Wind Power
  • Operator: Global Wind Power
  • Owner: Zopf GmbH
  • Source: http://www.zopf-gmbh.de/htm/Referenzen.htm

       Production forecast

  • From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 39.7 %
  • Expected production: 16,190 kWh
  • Values from Weathernews Windcaster solution

Localisation


Part #1:

  • Latitude: 52° 52' 11.9"
  • Longitude: 12° 29' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52° 52' 11.9"
  • Longitude: 12° 29' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 52° 51' 0"
  • Longitude: 12° 29' 24"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Latitude: 52° 52' 11.9"
  • Longitude: 12° 29' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 52° 51' 0"
  • Longitude: 12° 29' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 52° 52' 11.9"
  • Longitude: 12° 29' 24"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 18 September 2019