[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Neuruppin
- Commissioning: 2013/12
- 1 turbine: Senvion MM92/2050 (power 2 050 kW, diameter 92 m)
- Hub height: 100 m
- Total nominal power: 2,050 kW
- Operational
- Onshore wind farm
- Developer: Denker&Wulf
Production forecast
- From Tuesday, December 10 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 22.2 %
- Expected production: 15,960 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Neuruppin
- Commissioning: 2005/01
- 2 turbines: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height: 64 m
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Difko AS
Production forecast
- From Tuesday, December 10 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 22.2 %
- Expected production: 7,980 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Neuruppin, Dabergotz
- Commissioning: 2013/11
- 8 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height: 105 m
- Total nominal power: 16,000 kW
- Operational
- Onshore wind farm
- Developer: Ventotec
- Operator: Windenergie Neuruppin GmbH
- Source: http://www.ventotec.de/en/referenzen.html
- Source: http://www.windenergie-neuruppin.de/Von_der_Windenergie_Neuruppin_betreute_Windparks_.5.htm
Localisation
Part #1:
- Latitude: 52° 54' 26"
- Longitude: 12° 44' 44.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 54' 26"
- Longitude: 12° 44' 44.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 52° 54' 54.9"
- Longitude: 12° 44' 30.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 18 September 2019
Complete/correct this sheet: