[Back to previous page]
Generalities
|
|
Details
- City: Haining
- Commissioning:

- 20 turbines: (manufacturer name not available)
- Total nominal power: 40,000 kW
- Operational
- Onshore wind farm
- Developer: CGN Wind Energy Ltd
Production forecast
- From Tuesday, January 26 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 21.7 %
- Expected production: 208,680 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 30° 30' 38.3"
- Longitude: 120° 40' 50.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 20 November 2017
Complete/correct this sheet: