[Back to previous page]
Details
- Commissioning:

- 1 turbine: Tacke TW-500 (power 500 kW, diameter 37 m)
- Hub height:

- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Operator: Caurus
Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.5 %
- Expected production: 180 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 49° 55' 6.1"
- Longitude: 17° 5' 15.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 December 2020
Complete/correct this sheet: