[Back to previous page]
Generalities
- Wind farm name: Apple Blossom
- Country: USA
- County / Zone: Michigan
|
|
Details
- City: Huron
- Commissioning: 2017
- 29 turbines: Vestas V126/3450 (power 3 450 kW, diameter 126 m)
- Total nominal power: 100,050 kW
- Operational
- Onshore wind farm
- Developers: Sempra/Geronimo Energy
- Owner: Sempra
- Source: http://www.semprarenewables.com/project/apple-blossom/
- Source: https://www.geronimoenergy.com/our-projects/
Production forecast
- From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 89.8 %
- Expected production: 543,260 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 43° 49' 50.6"
- Longitude: -83° 1' 30.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 October 2019
Complete/correct this sheet: