[Back to previous page]
Details
Part #1:
Production forecast
- From Friday, July 01 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 26.7 %
- Expected production: 86,500 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Altmark
- Commissioning:

- 9 turbines: (manufacturer name not available)
- Total nominal power: 13,500 kW
- Operational
- Onshore wind farm
- Operator: ERG SpA
- Owner:

- Source:

Production forecast
- From Friday, July 01 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 24.2 %
- Expected production: 78,310 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Kalbe (Milde)
- Commissioning:

- 4 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Hub height:

- Total nominal power: 9,400 kW
- Operational
- Onshore wind farm
- Developer: Windstrom
- Operator: Windstrom
- Source:

Localisation
Part #1:
- Latitude: 52° 45' 28.9"
- Longitude: 11° 17' 49.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 45' 28.9"
- Longitude: 11° 17' 49.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 52° 45' 59.6"
- Longitude: 11° 18' 15.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 20 September 2021
Complete/correct this sheet: