[Back to previous page]
Generalities
- Wind farm name: San Marco in Lamis
- Country: Italy
- County / Zone: Puglia
|
|
Details
Part #1:
- City: San Marco in Lamis
- Commissioning:

- 1 turbine: Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Developer: Alerion
- Operator: Alerion
- Source:

Production forecast
- From Tuesday, March 28 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 67.9 %
- Expected production: 13,040 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: San Marco in Lamis
- Commissioning:

- 13 turbines: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
- Hub height:

- Total nominal power: 44,200 kW
- Operational
- Onshore wind farm
- Developer: Alerion
- Operator: Alerion
- Owner:

- Source:

- Source:

Production forecast
- From Tuesday, March 28 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 69.7 %
- Expected production: 739,450 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 41° 35' 46.4"
- Longitude: 15° 37' 56.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 41° 35' 46.4"
- Longitude: 15° 37' 56.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 27 September 2022
Complete/correct this sheet: