[Back to previous page]
Details
Part #1:
- Part: Phase I
- City: Fintona
- Commissioning:

- 9 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height:

- Total nominal power: 5,940 kW
- Operational
- Onshore wind farm
- Developers: RES/B9 Energy
- Operator: RES
- Owner:

- Source:

- Source:

- Source:

Production forecast
- From Tuesday, August 09 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0 %
- Expected production: 0 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Phase II
- City: Fivemiletown, Fintona
- Commissioning:

- 11 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 7,260 kW
- Operational
- Onshore wind farm
- Developers: RES/B9 Energy
- Owner:

- Source:

- Source:

- Source:

Production forecast
- From Tuesday, August 09 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.1 %
- Expected production: 220 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Phase I
- Latitude: 54° 26' 14.5"
- Longitude: -7° 20' 13.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Phase II
- Latitude: 54° 26' 14.5"
- Longitude: -7° 20' 13.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures

Author: Aaron Donoghue - License: All right reserved
Picture reference: 10502
Update for this sheet: 16 December 2021
Complete/correct this sheet: