Wind farms
Balikun Santanghu No.2 Farm (China)| Balikun Santanghu No.2 Farm (China) |
|
| Operational (448 MW) |

| Country | China |
| County/Zone | Xinjiang |
| City | Santanghu |
| Wind farm type | Onshore wind farm |

![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 48 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |

| Developer | #ND |
| Operators |
![]() ![]() #ND |
| Owners |
![]() ![]() ![]() ![]() ![]() #ND |
| Manufacturer | #ND |

| Operational | #ND |

| No source available |

| City | Santanghu |
| Commissioning | ![]() |
| Turbine(s) | (manufacturer name not available) |
| Total nominal power | 50,000 kW |
| Status | Operational |
| Coordinates | Latitude 44° 16' 32.5" - Longitude 92° 57' 15.8" |
| Precise localization | No |
| City | Santanghu |
| Commissioning | ![]() |
| Turbine(s) | (manufacturer name not available) |
| Total nominal power | 50,000 kW |
| Status | Operational |
| Coordinates | Latitude 44° 14' 26.8" - Longitude 93° 20' 5.6" |
| Precise localization | No |
| City | Santanghu |
| Commissioning | ![]() |
| Turbine(s) | (manufacturer name not available) |
| Total nominal power | 50,000 kW |
| Status | Operational |
| Coordinates | Latitude 44° 14' 14.2" - Longitude 92° 48' 25.2" |
| Precise localization | No |
Databases ![]() China (717.3 GW) Asia (1,064.4 GW) World (2,491.2 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Balikun Santanghu First (6 km) Santanghu (9 km) Chongqing (9 km) Chongqing Power Export (10 km) Hami (10 km) Balikun Santanghu (19 km) Balikun Thirteenth Division Santanghu (30 km) Hongxing 1 Pasture (33 km) Santanghu First Area B (49 km) Balikun Hongxing (60 km) | ||
|
Insights Production capacity China : 640,626.0 MW (end of 2025) Xinjiang : 79,933.1 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 3 September 2022 |
||