[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Pendine
- Commissioning:

- 5 turbines: Micon M1800-750/48 (power 750 kW, diameter 48.2 m)
- Total nominal power: 3,750 kW
- Operational
- Onshore wind farm
- Developer: Vattenfall
- Operator: Vattenfall
- Owner:

- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 9.6 %
- Expected production: 8,650 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Extension
- City: Pendine
- Commissioning:

- 6 turbines: Enercon E48/800 (power 800 kW, diameter 48 m)
- Hub height:

- Total nominal power: 4,800 kW
- Operational
- Onshore wind farm
- Developer: Vattenfall
- Operator: Vattenfall
- Owner:

- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.6 %
- Expected production: 8,700 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 45' 35.6"
- Longitude: -4° 31' 53.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Extension
- Latitude: 51° 45' 35.6"
- Longitude: -4° 31' 53.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 16 December 2021
Complete/correct this sheet: