Wind farms
Les Rossignols (France)| Les Rossignols (France) |
|
| Operational (20 MW) |

| Country | France |
| County/Zone | 62 (Hauts-de-France) |
| City | Mouriez - Tortefontaine |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 12 MW commissioned |
![]() | 2 MW commissioned |

| Developers |
![]() ![]() ![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Vestas V126/3000 (x 4) |
| Operational | Vestas V90/2000 (x 3) |
| Operational | Vestas V100/2000 (x 1) |

![]() | |

| Part | Extension |
| City | Tortefontaine, Mouriez |
| Commissioning | ![]() |
| Turbines | 4x Vestas V126/3000 (power 3,000 kW, diameter 126 m) |
| Hub height | ![]() |
| Total nominal power | 12,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 50° 21' 5.3" - Longitude 1° 55' 16.5" |
| Precise localization | Yes |
| Part | Extension |
| City | Tortefontaine, Mouriez |
| Commissioning | ![]() |
| Turbine | 1x Vestas V100/2000 (power 2,000 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 50° 21' 51.5" - Longitude 1° 55' 46.2" |
| Precise localization | Yes |
| Part | Hesdin 1Bis |
| City | Tortefontaine |
| Commissioning | ![]() |
| Turbines | 3x Vestas V90/2000 (power 2,000 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developers | /![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 50° 21' 9.2" - Longitude 1° 54' 25.6" |
| Precise localization | Yes |
Databases ![]() France (32.0 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Tortefontaine (1 km) Bois de Morval (3 km) Parc des Joyeux Développeurs (7 km) Caumont-Chériennes (10 km) Le Nouvion Saint Riquier 1 (13 km) Vron 1 (13 km) Vron 2 (13 km) Le Nouvion Saint Riquier 2 (14 km) Tigny-Noyelle (14 km) Le Nouvion Saint Riquier 3 (15 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 62 (Hauts-de-France) : 1,685.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 26 November 2025 |
||