The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Ffynnon Oer (United-Kingdom)


[Back to previous page]

United-Kingdom wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • Commissioning: 2006/06
  • 7 turbines: Repower MM70 (power 2 000 kW, diameter 70 m)
  • Hub height: 58 m
  • Total nominal power: 14,000 kW
  • Operational
  • Onshore wind farm
  • Developer: RWE
  • Operator: Ventient Energy
  • Owner: Ventient Energy
  • Source: https://www.ventientenergy.com/our-portfolio/

       Production forecast

  • From Thursday, November 21 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 77.7 %
  • Expected production: 261,060 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • Commissioning: 2005
  • 9 turbines: Repower MM70 (power 2 000 kW, diameter 70 m)
  • Hub height: 58 m
  • Total nominal power: 18,000 kW
  • Operational
  • Onshore wind farm
  • Developer: RWE
  • Operator: Ventient Energy
  • Owner: Ventient Energy
  • Source: https://www.ventientenergy.com/our-portfolio/

       Production forecast

  • From Thursday, November 21 2019, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 78 %
  • Expected production: 336,770 kWh
  • Values from Weathernews Windcaster solution

Localisation


Part #1:

  • Latitude: 51° 40' 28.1"
  • Longitude: -3° 40' 12.2"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 51° 40' 28.1"
  • Longitude: -3° 40' 12.2"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 10 September 2019
Complete/correct this sheet: