[Back to previous page]
Generalities
|
|
Details
Part #1:
- Commissioning:

- 25 turbines: Siemens SWT-3.6-107 (power 3 600 kW, diameter 107 m)
- Hub height:

- Total nominal power: 90,000 kW
- Operational
- Offshore wind farm
- Developers: WPO/Orsted
- Operator: Orsted
- Owner:

- Source:

Production forecast
- From Monday, August 15 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 8.8 %
- Expected production: 189,350 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Extension
- Commissioning:

- 32 turbines: Vestas V164/8000 (power 8 000 kW, diameter 164 m)
- Hub height:

- Total nominal power: 256,000 kW
- Operational
- Offshore wind farm
- Developer: Orsted
- Operator: Orsted
- Owners:
/
/
/
- Source:

- Source:

Production forecast
- From Monday, August 15 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 11.6 %
- Expected production: 715,550 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 29' 30.1"
- Longitude: -3° 12' 0.7"
- Depth: -5 m
- Distance from shore: 7 km
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Extension
- Latitude: 53° 28' 58.7"
- Longitude: -3° 16' 22.8"
- Depth: -10 m
- Distance from shore: 9 km
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 29 June 2022
Complete/correct this sheet: