Generalities
|
|
Details
Part #1:
- Commissioning:

- 2 turbines: Micon M1800-750/48 (power 750 kW, diameter 48.2 m)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: Orsted
- Operator: Orsted
- Owner:

Production forecast
- From Wednesday, February 1 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 88.8 %
- Expected production: 31,970 kWh
- Values from Weathernews Windcaster solution
Part #2:
Production forecast
- From Wednesday, February 1 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 93.5 %
- Expected production: 218,720 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 57° 2' 7.4"
- Longitude: 9° 56' 2.3"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 57° 2' 7.4"
- Longitude: 9° 56' 2.3"
- Geodetic system: WGS84
- Precise localization: no