Wind farms
Deerfield II (USA)| Deerfield II (USA) |
|
| Operational (112,1 MW) |

| Country | USA |
| County/Zone | Michigan |
| City | Huron |
| Wind farm type | Onshore wind farm |

![]() | 10.5 MW commissioned |
![]() | 96 MW commissioned |
![]() | 5.6 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Vestas V162/6.0MW (x 16) |
| Operational | Siemens-Gamesa SG 2.6-114 (x 4) |
| Operational | Vestas V150/5.6MW (x 1) |

| No source available |

| City | Huron |
| Commissioning | ![]() |
| Turbines | 4x Siemens-Gamesa SG 2.6-114 (power 2,625 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 10,500 kW |
| Status | Operational |
| Coordinates | Latitude 43° 27' 26.2" - Longitude -84° 7' 46.7" |
| Precise localization | Yes |
| City | Huron |
| Commissioning | ![]() |
| Turbines | 16x Vestas V162/6.0MW (power 6,000 kW, diameter 162 m) |
| Hub height | ![]() |
| Total nominal power | 96,000 kW |
| Status | Operational |
| Coordinates | Latitude 43° 27' 26.2" - Longitude -84° 7' 46.7" |
| Precise localization | Yes |
| City | Huron |
| Commissioning | ![]() |
| Turbine | 1x Vestas V150/5.6MW (power 5,600 kW, diameter 150 m) |
| Hub height | ![]() |
| Total nominal power | 5,600 kW |
| Status | Operational |
| Coordinates | Latitude 43° 27' 26.2" - Longitude -84° 7' 46.7" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Meridian Wind Park (14 km) Gratiot Windfarm (23 km) Polaris (33 km) Beebe (39 km) Pegasus (41 km) Tuscola I (42 km) Pine River (42 km) Tuscola II (50 km) Cross Winds III (51 km) Cross Winds II (51 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Michigan : 3,753.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 18 December 2025 |
||