[Back to previous page]
Details
Part #1:
- Part: Moulins du Haut Anjou
- City: Freigné
- Commissioning:

- 3 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operators: CNR/Energieteam
- Owner:

- Source:

Production forecast
- From Thursday, July 07 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 13.5 %
- Expected production: 22,390 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Moulins du Haut Anjou
- City: Freigné
- Commissioning:

- 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operators: CNR/Energieteam
- Owner:

- Source:

Production forecast
- From Thursday, July 07 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 12.4 %
- Expected production: 6,820 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Moulins du Haut Anjou
- Latitude: 47° 33' 11.1"
- Longitude: -1° 9' 42.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Moulins du Haut Anjou
- Latitude: 47° 33' 11.1"
- Longitude: -1° 9' 42.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 February 2020
Complete/correct this sheet: