Wind farms
Hauteville 1 (France)| Hauteville 1 (France) |
|
| Operational (25 MW) |

| Country | France |
| County/Zone | 02 (Hauts-de-France) |
| City | Hauteville - Noyales |
| Wind farm type | Onshore wind farm |

![]() | 12.5 MW commissioned |
![]() | 12.5 MW commissioned |

| Developers |
![]() ![]() |
| Operators |
![]() ![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Fuhrländer FL 2500/90 (x 10) |

![]() | |

| City | Hauteville, Noyales |
| Commissioning | ![]() |
| Turbines | 5x Fuhrländer FL 2500/90 (power 2,500 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 12,500 kW |
| Status | Operational |
| Developers | /![]() |
| Operators | /![]() |
| Owner | ![]() |
| Coordinates | Latitude 49° 53' 43.8" - Longitude 3° 31' 19.1" |
| Altitude | 140 m |
| Precise localization | Yes |
| City | Hauteville, Noyales |
| Commissioning | ![]() |
| Turbines | 5x Fuhrländer FL 2500/90 (power 2,500 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 12,500 kW |
| Status | Operational |
| Developers | /![]() |
| Operators | /![]() |
| Owner | ![]() |
| Coordinates | Latitude 49° 53' 43.8" - Longitude 3° 31' 19.1" |
| Altitude | 140 m |
| Precise localization | Yes |
Databases ![]() France (36.2 GW) Europe (658.4 GW) World (2,459.0 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Noyales (1 km) Val d’Origny (5 km) Mont d’Origny (7 km) La Mutte (7 km) La Voie Verte (8 km) Puisieux-et-Clanlieu (9 km) Clanlieu 2 (11 km) Saint Quentinois (11 km) Basse Thiérache Sud (12 km) Fresnoy-le-Grand (12 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 02 (Hauts-de-France) : 1,463.8 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 24 June 2026 |
||