Wind farms
Mynydd Gorddu (United-Kingdom)| Mynydd Gorddu (United-Kingdom) |
|
| Operational (9,5 MW) |

| Country | United-Kingdom |
| County/Zone | Ceredigion (Wales) |
| City | Ceredigion |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 3.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Micon M1500-500 (x 19) |

![]() | |

| City | Ceredigion |
| Commissioning | ![]() |
| Turbines | 12x Micon M1500-500 (power 500 kW, diameter 43 m) |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 27' 53.8" - Longitude -3° 57' 38.5" |
| Precise localization | Yes |
| City | Ceredigion |
| Commissioning | ![]() |
| Turbines | 7x Micon M1500-500 (power 500 kW, diameter 43 m) |
| Total nominal power | 3,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 27' 53.8" - Longitude -3° 57' 38.5" |
| Precise localization | Yes |
Databases ![]() United-Kingdom (104.8 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Rheidol (8 km) Cefn Croes (16 km) Llangwyryfon (18 km) BDCR II (19 km) Bryn Blaen (24 km) Carno (26 km) Cemmaes (28 km) Bryn Titli (29 km) TirGwynt Wind Farm (35 km) Llandinam (37 km) | ||
|
Insights Production capacity United-Kingdom : 32,894.0 MW (end of 2025) Ceredigion (Wales) : 79.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 May 2026 |
||