[Back to previous page]
Generalities
|
|
Details
- Commissioning:

- 5 turbines: (manufacturer name not available)
- Total nominal power: 21,000 kW
- Operational
- Onshore wind farm
- Operators: Infinergy/Boralex
Localisation
- Latitude: 58° 31' 6.2"
- Longitude: -3° 39' 36.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 30 October 2025
Complete/correct this sheet: