[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Offshore Part
- Commissioning:

- 8 turbines: Siemens SWT-3.3-130 (power 3 300 kW, diameter 130 m)
- Hub height:

- Total nominal power: 26,400 kW
- Operational
- Offshore wind farm
- Developer: OX2
- Operator: OX2
- Owner:

- Source:

Production forecast
- From Friday, February 3 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 0 %
- Expected production: 0 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Onshore Part
- Commissioning:

- 5 turbines: Siemens SWT-3.2-113 (power 3 200 kW, diameter 113 m)
- Hub height:

- Total nominal power: 16,000 kW
- Operational
- Onshore wind farm
- Developer: OX2
- Operator: OX2
- Owner:

- Source:

Production forecast
- From Friday, February 3 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 0 %
- Expected production: 0 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Offshore Part
- Latitude: 65° 40' 3.6"
- Longitude: 24° 32' 41.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Onshore Part
- Latitude: 65° 40' 3.6"
- Longitude: 24° 32' 41.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 13 September 2022
Complete/correct this sheet: