Wind farms
Le Bois de Tappe (France)| Le Bois de Tappe (France) |
|
| Operational (6 MW) |

| Country | France |
| County/Zone | 54 (Grand Est) |
| City | Doncourt-lés-Longuyon |
| Other name | Deux Rivières |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |

| Developer |
![]() |
| Operators |
![]() ![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Vestas V90/2000 (x 3) |

![]() | |
![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 49° 26' 54.7" - Longitude 5° 42' 34.9" |
| Precise localization | Yes |
Databases ![]() France (32.0 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms La Croix Didier (1 km) La Volette (7 km) Longuyon 2 (8 km) Longuyon 1 (8 km) Les Neufs Champs (9 km) La Pièce du Roi (10 km) Fillières (10 km) Audunois Nord (13 km) Allondrelle-la-Malmaison (14 km) Boulange (18 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 54 (Grand Est) : 139.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 14 November 2025 |
||