[Back to previous page]
Details
Part #1:
- Part: Erbray
- City: Erbray
- Commissioning:

- 5 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operators: CNR/Energieteam
- Owner:

- Source:

Production forecast
- From Monday, June 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 8.8 %
- Expected production: 24,220 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Soudan
- City: Soudan
- Commissioning:

- 3 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operators: CNR/Energieteam
- Owner:

- Source:

Production forecast
- From Monday, June 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 9.2 %
- Expected production: 15,230 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Erbray
- Latitude: 47° 41' 7.9"
- Longitude: -1° 17' 52.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Soudan
- Latitude: 47° 42' 47.7"
- Longitude: -1° 19' 57.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 26 August 2021
Complete/correct this sheet: