Wind farms
Negrelo-Guilhado (Portugal)| Negrelo-Guilhado (Portugal) |
|
| Operational (22,3 MW) |

| Country | Portugal |
| County/Zone | Vila Real (Norte) |
| City | Vila Pouca de Aguiar |
| Wind farm type | Onshore wind farm |

![]() | 20 MW commissioned |
![]() | 2.3 MW commissioned |

| Developers |
![]() #ND |
| Operator |
![]() |
| Owners |
![]() #ND |
| Manufacturer |
|

| Operational | Enercon E82/2000 (x 10) |
| Operational | Enercon E82/2300 (x 1) |

![]() | |

| City | Vila Pouca de Aguiar |
| Commissioning | ![]() |
| Turbines | 10x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 20,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 28' 30.1" - Longitude -7° 37' 37.8" |
| Precise localization | Yes |
| City | Vila Pouca de Aguiar |
| Commissioning | ![]() |
| Turbine | 1x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 2,300 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 41° 28' 30.1" - Longitude -7° 37' 37.8" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Salgueiros-Guilhado (3 km) Cha do Guilhado (3 km) Trandeiras (10 km) Bulgueira (10 km) Alto da Coutada (10 km) Serra do Alvao (11 km) Casa da Lagoa (13 km) Padrela (13 km) Gevancas II (16 km) Alto do Marco (16 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Vila Real (Norte) : 684.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 1 December 2023 |
||