Wind farms
Ralanda (Sweden)| Ralanda (Sweden) |
|
| Operational (4,8 MW) |

| Country | Sweden |
| County/Zone | Västra Götaland |
| City | Uddevalla |
| Wind farm type | Onshore wind farm |

![]() | 0.8 MW commissioned |
![]() | 4 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon (x 2) |
| Operational | Enercon E48/800 (x 1) |

| No source available |

| City | Uddevalla |
| Commissioning | ![]() |
| Turbine | 1x Enercon E48/800 (power 800 kW, diameter 48 m) |
| Hub height | ![]() |
| Total nominal power | 800 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 58° 22' 23" - Longitude 11° 42' 58" |
| Altitude | 90 m |
| Precise localization | No |
| City | Uddevalla |
| Commissioning | ![]() |
| Turbines | 2x Enercon |
| Hub height | ![]() |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 58° 22' 23" - Longitude 11° 42' 58" |
| Altitude | 90 m |
| Precise localization | No |
Databases ![]() Sweden (92.9 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Gunnarby (3 km) Hermansröd (11 km) Järmunderöd(Lilla Parken) 3 verk (11 km) Hällvadsholm (11 km) As (11 km) Torkelsrud (14 km) Henan-Häröd (18 km) Humlekärr (18 km) Allmag (18 km) Lys-Vind (20 km) | ||
|
Insights Production capacity Sweden : 18,515.0 MW (end of 2025) Västra Götaland : 1,482.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 8 September 2025 |
||