Wind farms
Topperyd (Sweden)| Topperyd (Sweden) |
|
| Operational (8 MW) |

| Country | Sweden |
| County/Zone | Jönköping |
| City | Nässjö |
| Wind farm type | Onshore wind farm |

![]() | 2 MW commissioned |
![]() | 6 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V90/2000 (x 4) |

| No source available |

| City | Nässjö |
| Commissioning | ![]() |
| Turbine | 1x Vestas V90/2000 (power 2,000 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 57° 39' 54.2" - Longitude 14° 32' 28.9" |
| Altitude | 340 m |
| Precise localization | No |
| City | Nässjö |
| Commissioning | ![]() |
| Turbines | 3x Vestas V90/2000 (power 2,000 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 57° 39' 54.2" - Longitude 14° 32' 28.9" |
| Altitude | 340 m |
| Precise localization | No |
Databases ![]() Sweden (92.9 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hallhult (6 km) Fredriksdal (7 km) Tapplarp (9 km) Assjö 1-Ella (25 km) Norra Vedbo (25 km) Lyckas (26 km) Stensasa (31 km) Boarp (31 km) Bruzaholm (39 km) Sötterfällan (40 km) | ||
|
Insights Production capacity Sweden : 18,515.0 MW (end of 2025) Jönköping : 690.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 5 September 2025 |
||