- Wind farm name: San Cireo
- Country: Italy
- County / Zone: Puglia
|
|
Details
Part #1:
- Part: Troia
- City: Troia
- Commissioning:

- 5 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developer: ERG SpA
- Operator: ERG SpA
- Owner:

Production forecast
- From Monday, April 3 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 92.8 %
- Expected production: 222,750 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Troia
- City: Troia
- Commissioning:

- 10 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 20,000 kW
- Operational
- Onshore wind farm
- Developer: ERG SpA
- Operator: ERG SpA
- Owner:

Production forecast
- From Monday, April 3 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 95.4 %
- Expected production: 457,930 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Troia
- Latitude: 41° 20' 11.8"
- Longitude: 15° 18' 5.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Troia
- Latitude: 41° 20' 11.8"
- Longitude: 15° 18' 5.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 January 2018