[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- City: Tula
- Commissioning:

- 28 turbines: Gamesa
- Total nominal power: 23,800 kW
- Operational
- Onshore wind farm
- Operator: Enel GreenPower
Production forecast
- From Thursday, October 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.1 %
- Expected production: 6,040 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Part 1
- City: Tula
- Commissioning:

- 6 turbines: (manufacturer name not available)
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Operator: Enel GreenPower
Production forecast
- From Thursday, October 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.1 %
- Expected production: 2,290 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Part 2
- City: Tula
- Commissioning:

- 2 turbines: GE Energy 1.5s (power 1 500 kW, diameter 70.5 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Operator: Enel GreenPower
Production forecast
- From Thursday, October 5 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.7 %
- Expected production: 490 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Part 1
- Latitude: 40° 46' 21.4"
- Longitude: 8° 58' 3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Part 1
- Latitude: 40° 46' 21.4"
- Longitude: 8° 58' 3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Part 2
- Latitude: 40° 46' 21.4"
- Longitude: 8° 58' 3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: