[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Amaroni
- Commissioning:

- 7 turbines: Nordex N90/2500 (power 2 500 kW, diameter 90 m)
- Total nominal power: 17,500 kW
- Operational
- Onshore wind farm
- Developer: Nordex
- Operator: ERG SpA
- Owner:

- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.1 %
- Expected production: 4,780 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Amaroni
- Commissioning:

- 2 turbines: Nordex N90/2500 (power 2 500 kW, diameter 90 m)
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
- Developer: ERG SpA
- Operator: ERG SpA
- Owner:

- Source:

Production forecast
- From Friday, August 12 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.4 %
- Expected production: 1,680 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 38° 47' 1.2"
- Longitude: 16° 25' 21.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 38° 46' 55.9"
- Longitude: 16° 26' 5.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 23 September 2019
Complete/correct this sheet: