Generalities
|
|
Details
- City: A Lama, Forcarei, Cotobade
- 16 turbines: Gamesa G47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 10,560 kW
- Operational
- Onshore wind farm
- Developer: Olivento SL
- Operator: Olivento SL
Production forecast
- From Saturday, January 28 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 89.5 %
- Expected production: 226,820 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 42° 27' 39.8"
- Longitude: -8° 23' 41.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 15 August 2022