Plateau Ardéchois (France)| Plateau Ardéchois (France) |
|
| Operational (6,8 MW) |

| Country | France |
| County/Zone | 07 (Auvergne-Rhône-Alpes) |
| City | Cros-de-Géorand |
| Wind farm type | Onshore wind farm |

![]() | 3.4 MW commissioned |
![]() | 3.4 MW commissioned |

| Developers |
![]() ![]() |
| Operators |
![]() ![]() ![]() |
| Owners |
![]() ![]() |
| Manufacturers |
|

| Operational | Vestas V52/850 (x 4) |
| Operational | Gamesa G52/850 (x 4) |

![]() | |

| City | Cros-de-Géorand |
| Commissioning | ![]() |
| Turbines | 4x Vestas V52/850 (power 850 kW, diameter 52 m) |
| Hub height | ![]() |
| Total nominal power | 3,400 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 44° 48' 36" - Longitude 4° 8' 23.9" |
| Precise localization | Yes |
| City | Cros-de-Géorand |
| Commissioning | ![]() |
| Turbines | 4x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 3,400 kW |
| Status | Operational |
| Developers | /![]() |
| Operators | /![]() |
| Owner | ![]() |
| Coordinates | Latitude 44° 48' 36" - Longitude 4° 8' 23.9" |
| Precise localization | Yes |
Databases ![]() France (36.2 GW) Europe (660.0 GW) World (2,460.7 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Sources de la Loire (6 km) La Montagne ardéchoise (13 km) Labastide-sur-Bésorgues (14 km) Les Barthes (15 km) Saint-Clément (18 km) La Montagne ardéchoise - Cham Longe (19 km) Saint-Agrève la Citadelle (30 km) Les Taillades (33 km) Serre des Fourches (33 km) Saint-Jean-Lachalm I (36 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 07 (Auvergne-Rhône-Alpes) : 224.4 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 21 June 2026 |
||